New supply contract for electric power

Borregaard and Statkraft Energi have entered into a new long-term contract for renewable electric power for a total of 1,75 TWh to be supplied to the Sarpsborg site in the period 2020 to 2029, with annual deliveries of 175 GWh. This represents approximately 25% of the site’s annual consumption of electric power.